{"data":{"id":"us/23-cfr-636.104","jurisdiction":"us","citation":"23 CFR 636.104","heading":"Does this part apply to all Federal-aid design-build projects?","body":"The provisions of this part apply to all Federal-aid design-build projects within the highway right-of-way or linked to a Federal-aid highway project (i.e., the project would not exist without another Federal-aid highway project). Projects that are not located within the highway right-of-way, and not linked to a Federal-aid highway project may utilize State-approved procedures.","path":["Title 23—Highways","CHAPTER I—FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER G—ENGINEERING AND TRAFFIC OPERATIONS","PART 636—DESIGN-BUILD CONTRACTING","Subpart A—General"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-23.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:50Z","sha256":"8ca3d40287dc3ca8d2975a56e98dce6c9501a6e0018f63c112677aee28f7baeb","source_id":"us-cfr","stale":true,"prev":"us/23-cfr-636.103","next":"us/23-cfr-636.105"},"notice":"GroundRules: Original legal text. Not legal advice."}
