{"data":{"id":"us/23-cfr-636.118","jurisdiction":"us","citation":"23 CFR 636.118","heading":"Is team switching allowed after contract award?","body":"Where the offeror's qualifications are a major factor in the selection of the successful design-builder, team member switching (adding or switching team members) is discouraged after contract award. However, the owner may use its discretion in reviewing team changes or team enhancement requests on a case-by-case basis. Specific project rules related to changes in team members or changes in personnel within teams should be explicitly stated by the STD in all project solicitations.","path":["Title 23—Highways","CHAPTER I—FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER G—ENGINEERING AND TRAFFIC OPERATIONS","PART 636—DESIGN-BUILD CONTRACTING","Subpart A—General"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-23.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:50Z","sha256":"fe17ad49eb082cc50f2c1db43ee09648f5701bf0ada06e928e6c12bc2bc8f2f2","source_id":"us-cfr","stale":true,"prev":"us/23-cfr-636.117","next":"us/23-cfr-636.119"},"notice":"GroundRules: Original legal text. Not legal advice."}
