{"data":{"id":"us/23-cfr-636.207","jurisdiction":"us","citation":"23 CFR 636.207","heading":"Is there a limit on short listed firms?","body":"Normally, three to five firms are short listed, however, the maximum number specified shall not exceed five unless you determine, for that particular solicitation, that a number greater than five is in your interest and is consistent with the purposes and objectives of two-phase design-build contracting.","path":["Title 23—Highways","CHAPTER I—FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER G—ENGINEERING AND TRAFFIC OPERATIONS","PART 636—DESIGN-BUILD CONTRACTING","Subpart B—Selection Procedures, Award Criteria"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-23.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:50Z","sha256":"f38e7d9b218d1d3dc463acda7c185a7484702771716b269c469f60b8a4b3e808","source_id":"us-cfr","stale":true,"prev":"us/23-cfr-636.206","next":"us/23-cfr-636.208"},"notice":"GroundRules: Original legal text. Not legal advice."}
