{"data":{"id":"us/23-cfr-636.208","jurisdiction":"us","citation":"23 CFR 636.208","heading":"May I use my existing prequalification procedures with design-build contracts?","body":"Yes, you may use your existing prequalification procedures for either construction or engineering design firms as a supplement to the procedures in this part.","path":["Title 23—Highways","CHAPTER I—FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER G—ENGINEERING AND TRAFFIC OPERATIONS","PART 636—DESIGN-BUILD CONTRACTING","Subpart B—Selection Procedures, Award Criteria"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-23.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:50Z","sha256":"39b681aa9369d98257646577a1eba2da226bf376c944465a31bf5b930b3e7f18","source_id":"us-cfr","stale":true,"prev":"us/23-cfr-636.207","next":"us/23-cfr-636.209"},"notice":"GroundRules: Original legal text. Not legal advice."}
