{"data":{"id":"us/23-cfr-650.109","jurisdiction":"us","citation":"23 CFR 650.109","heading":"Public involvement.","body":"Procedures which have been established to meet the public involvement requirements of 23 CFR part 771 shall be used to provide opportunity for early public review and comment on alternatives which contain encroachments.","path":["Title 23—Highways","CHAPTER I—FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER G—ENGINEERING AND TRAFFIC OPERATIONS","PART 650—BRIDGES, STRUCTURES, AND HYDRAULICS","Subpart A—Location and Hydraulic Design of Encroachments on Flood Plains"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-23.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:50Z","sha256":"f1f9bb9f4f10dbd7852421224596918dfb6989090f0100bf965c3c4291a51a44","source_id":"us-cfr","stale":true,"prev":"us/23-cfr-650.107","next":"us/23-cfr-650.111"},"notice":"GroundRules: Original legal text. Not legal advice."}
