{"data":{"id":"us/23-cfr-650.207","jurisdiction":"us","citation":"23 CFR 650.207","heading":"Plans, specifications and estimates.","body":"(a) Emphasis shall be placed on erosion control in the preparation of plans, specifications and estimates.\n(b) All reasonable steps shall be taken to insure that highway project designs for the control of erosion and sedimentation and the protection of water quality comply with applicable standards and regulations of other agencies.","path":["Title 23—Highways","CHAPTER I—FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER G—ENGINEERING AND TRAFFIC OPERATIONS","PART 650—BRIDGES, STRUCTURES, AND HYDRAULICS","Subpart B—Erosion and Sediment Control on Highway Construction Projects"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-23.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:50Z","sha256":"3423d122b6434fd0d4866d18a63c7751ceacd247f9ea42405c4b40f59c2957e8","source_id":"us-cfr","stale":true,"prev":"us/23-cfr-650.205","next":"us/23-cfr-650.209"},"notice":"GroundRules: Original legal text. Not legal advice."}
