{"data":{"id":"us/23-cfr-661.37","jurisdiction":"us","citation":"23 CFR 661.37","heading":"What are the funding limitations on an individual TTF bridge project?","body":"The following funding provisions apply in administration of the TTFBP:\n(a) There are no funding limitations on an individual TTF bridge application, but the PE estimated cost will be based on the following fee scale:\nEstimated Construction Cost:\nUp to $1,000,000—Use up to 20% for PE\n$1,000,000 to $5,000,000—Use up to 15%-20% for PE\n$5,000,000 to $10,000,000—Use up to 10%-15% for PE\nOver $10,000,000—Use up to 10% for PE\n(b) Requests for additional funds for PE or construction may be submitted along with proper justification to FHWA for consideration. The request will be considered on a case-by-case basis. There is no guarantee for the approval of the request for additional funds.","path":["Title 23—Highways","CHAPTER I—FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER G—ENGINEERING AND TRAFFIC OPERATIONS","PART 661—TRIBAL TRANSPORTATION FACILITY BRIDGE PROGRAM (TTFBP)"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-23.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:50Z","sha256":"aafa0aa93d4824bb16873bba5e5781e3806d7e0657572aaa048245c1c33a3051","source_id":"us-cfr","stale":true,"prev":"us/23-cfr-661.35","next":"us/23-cfr-661.39"},"notice":"GroundRules: Original legal text. Not legal advice."}
