{"data":{"id":"us/23-cfr-661.41","jurisdiction":"us","citation":"23 CFR 661.41","heading":"After a bridge project has been completed (either PE or construction) what happens with the excess or surplus funding?","body":"Since the funding is project specific, once a bridge design or construction project has been completed under this program, any excess or surplus funding is returned to FHWA for use on additional approved TTF bridge projects.","path":["Title 23—Highways","CHAPTER I—FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER G—ENGINEERING AND TRAFFIC OPERATIONS","PART 661—TRIBAL TRANSPORTATION FACILITY BRIDGE PROGRAM (TTFBP)"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-23.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:50Z","sha256":"bfe026062e6e5f56e67ba95c0162183c0614299db6e2bf46005a17c21937fc2c","source_id":"us-cfr","stale":true,"prev":"us/23-cfr-661.39","next":"us/23-cfr-661.43"},"notice":"GroundRules: Original legal text. Not legal advice."}
