{"data":{"id":"us/23-cfr-668.213","jurisdiction":"us","citation":"23 CFR 668.213","heading":"Application procedures.","body":"(a) Based on the detailed site inspections and damage estimates prepared pursuant to paragraph (e) of § 668.211, the applicant will submit an application in the form of a letter to the DFDE which shall include a list of projects for which emergency relief is requested. The application shall be submitted within 3 months after an Affirmative Finding.\n(b) The list of projects shall include emergency repairs, PE, and permanent work, and provide for each project a location, length, project number, type of damage, description of work with a separate breakdown for betterments including a justification for those intended for emergency relief funding, proposed method of construction, estimated cost, and any other information requested by the DFDE.\n(c) If the initial list of projects is incomplete, a subsequent list(s) of projects shall be forwarded to the DFDE for approval consideration as soon as possible.","path":["Title 23—Highways","CHAPTER I—FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION","SUBCHAPTER G—ENGINEERING AND TRAFFIC OPERATIONS","PART 668—EMERGENCY RELIEF PROGRAM","Subpart B—Procedures for Federal Agencies for Federal Roads"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-23.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:50Z","sha256":"c20ddf8b6dd98475bc3b42639151aeb692c2c7103eaa1ca398bc7ada29bb9232","source_id":"us-cfr","stale":true,"prev":"us/23-cfr-668.211","next":"us/23-cfr-668.215"},"notice":"GroundRules: Original legal text. Not legal advice."}
