{"data":{"id":"us/25-cfr-137.6","jurisdiction":"us","citation":"25 CFR 137.6","heading":"Power development.","body":"The cost of the power development at the Coolidge Dam is hereby fixed at $735,000. The net revenues derived from the operation of this power development shall be disposed of as required by the terms and conditions of the act of March 7, 1928 (45 Stat. 210) as supplemented or amended.","path":["Title 25—Indians","CHAPTER I—BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR","SUBCHAPTER G—FINANCIAL ACTIVITIES","PART 137—REIMBURSEMENT OF CONSTRUCTION COSTS, SAN CARLOS INDIAN IRRIGATION PROJECT, ARIZONA"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-25.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:59Z","sha256":"e4ede826ef0dfcd8bab93b0ca04d2cce1966cd4c7073771e2d5e3b72b7c673e3","source_id":"us-cfr","stale":true,"prev":"us/25-cfr-137.5","next":"us/25-cfr-137.7"},"notice":"GroundRules: Original legal text. Not legal advice."}
