{"data":{"id":"us/25-cfr-161.306","jurisdiction":"us","citation":"25 CFR 161.306","heading":"When are permits effective?","body":"Unless otherwise provided in the permit, a permit will be effective on the date on which BIA approves the permit.","path":["Title 25—Indians","CHAPTER I—BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR","SUBCHAPTER H—LAND AND WATER","PART 161—NAVAJO PARTITIONED LANDS GRAZING PERMITS","Subpart D—Permit Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-25.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:59Z","sha256":"f80a6f822fe776f8665371b13117f7ac530f6d4865b1f1764a0e73dec26e1c51","source_id":"us-cfr","stale":true,"prev":"us/25-cfr-161.305","next":"us/25-cfr-161.307"},"notice":"GroundRules: Original legal text. Not legal advice."}
