{"data":{"id":"us/25-cfr-170.460","jurisdiction":"us","citation":"25 CFR 170.460","heading":"What must a project package include?","body":"The project package must include the following documentation, approved by the appropriate Public Authority, before the start of construction:\n(a) Plans, specifications, and estimates;\n(b) A Tribal resolution or other authorized document supporting the project;\n(c) Certification of compliance with the requirements of 25 CFR part 169, as well as any additional public taking documentation clearances, if applicable.\n(d) Required environmental, archeological, and cultural clearances; and\n(e) Identification of design exceptions if used in the plans.","path":["Title 25—Indians","CHAPTER I—BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR","SUBCHAPTER H—LAND AND WATER","PART 170—TRIBAL TRANSPORTATION PROGRAM","Subpart D—Planning, Design, and Construction of Tribal Transportation Program Facilities"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-25.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:59Z","sha256":"4e42dc642a6328d1163680a3b55127da23e33808db19cb71e3a0a0ef4f25b806","source_id":"us-cfr","stale":true,"prev":"us/25-cfr-170.457","next":"us/25-cfr-170.461"},"notice":"GroundRules: Original legal text. Not legal advice."}
