{"data":{"id":"us/25-cfr-170.514","jurisdiction":"us","citation":"25 CFR 170.514","heading":"Who reviews bridge inspection reports?","body":"The person responsible for the bridge inspection team must send a copy of the inspection report to BIADOT. BIADOT:\n(a) Reviews the report for quality assurance and works with FHWA to ensure the requirements of 23 U.S.C. 144 are carried out; and\n(b) Furnishes a copy of the report to the BIA Regional Office, which will forward the copy to the affected Tribe.","path":["Title 25—Indians","CHAPTER I—BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR","SUBCHAPTER H—LAND AND WATER","PART 170—TRIBAL TRANSPORTATION PROGRAM","Subpart D—Planning, Design, and Construction of Tribal Transportation Program Facilities"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-25.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:59Z","sha256":"6b5ab1dfb6381d91b76b1f468e21f8907b8b4319a0db4e1e0273cce62844dc4b","source_id":"us-cfr","stale":true,"prev":"us/25-cfr-170.513","next":"us/25-cfr-appendix-a-to-subpart-d-of-part-170"},"notice":"GroundRules: Original legal text. Not legal advice."}
