{"data":{"id":"us/25-cfr-173.8","jurisdiction":"us","citation":"25 CFR 173.8","heading":"Applications.","body":"All applications for permits must be made on the approved form. The project engineer will furnish copies of this form upon request. All applications must be executed in triplicate.","path":["Title 25—Indians","CHAPTER I—BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR","SUBCHAPTER H—LAND AND WATER","PART 173—CONCESSIONS, PERMITS AND LEASES ON LANDS WITHDRAWN OR ACQUIRED IN CONNECTION WITH INDIAN IRRIGATION PROJECTS"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-25.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:59Z","sha256":"e2b2ea16d4d9c8c98624bcbc70e5886a159c3ee74f10621a948c2f986f18a330","source_id":"us-cfr","stale":true,"prev":"us/25-cfr-173.7","next":"us/25-cfr-173.9"},"notice":"GroundRules: Original legal text. Not legal advice."}
