{"data":{"id":"us/25-cfr-273.121","jurisdiction":"us","citation":"25 CFR 273.121","heading":"When does the BIE Director approve the education plan?","body":"The BIE Director approves the education plan when a contractor submits a contract proposal for funding.","path":["Title 25—Indians","CHAPTER I—BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR","SUBCHAPTER M—INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT PROGRAM","PART 273—EDUCATION CONTRACTS UNDER JOHNSON-O'MALLEY ACT","Subpart D—Education Plan"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-25.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:24:59Z","sha256":"fefcb85aa404f7dabbe32a34ca58e28eafd1fa5eb83684f0316f60da135b9402","source_id":"us-cfr","stale":true,"prev":"us/25-cfr-273.120","next":"us/25-cfr-273.125"},"notice":"GroundRules: Original legal text. Not legal advice."}
