{"data":{"id":"us/29-cfr-1919.35","jurisdiction":"us","citation":"29 CFR 1919.35","heading":"Order of tests.","body":"When both unit and loose gear proof load tests are required, the loose gear test may be carried out after completion of the unit test.","path":["Title 29—Labor","Subtitle B—Regulations Relating to Labor","CHAPTER XVII—OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","PART 1919—GEAR CERTIFICATION","Subpart E—Certification of Vessels: Tests and Proof Loads; Heat Treatment; Competent Persons"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-29.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:20Z","sha256":"58edfeeb06e7b84a9051b416952f4350b0f36e45393037b755d71b779e38378d","source_id":"us-cfr","stale":true,"prev":"us/29-cfr-1919.34","next":"us/29-cfr-1919.36"},"notice":"GroundRules: Original legal text. Not legal advice."}
