{"data":{"id":"us/29-cfr-1926.858","jurisdiction":"us","citation":"29 CFR 1926.858","heading":"Removal of steel construction.","body":"(a) When floor arches have been removed, planking in accordance with § 1926.855(b) shall be provided for the workers engaged in razing the steel framing.\n(b) Cranes, derricks, and other hoisting equipment. Employers must meet the requirements specified in subparts N and CC of this part.\n(c) Steel construction shall be dismantled column length by column length, and tier by tier (columns may be in two-story lengths).\n(d) Any structural member being dismembered shall not be overstressed.","path":["Title 29—Labor","Subtitle B—Regulations Relating to Labor","CHAPTER XVII—OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","PART 1926—SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION","Subpart T—Demolition"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-29.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:20Z","sha256":"2200ef9bf64f04ed4b7b47f4e0a3c15418efe2ba529fce6ffa5a262fd7090dc6","source_id":"us-cfr","stale":true,"prev":"us/29-cfr-1926.857","next":"us/29-cfr-1926.859"},"notice":"GroundRules: Original legal text. Not legal advice."}
