{"data":{"id":"us/29-cfr-4043.68","jurisdiction":"us","citation":"29 CFR 4043.68","heading":"Insolvency or similar settlement.","body":"(a) Reportable event. Advance notice is required for an insolvency or similar settlement, as described in § 4043.35.\n(b) Extension. For a case or proceeding under § 4043.35(a)(1) or (2) that is not commenced by a member of the plan's controlled group, the notice date is extended to 10 days after the commencement of the case or proceeding.","path":["Title 29—Labor","Subtitle B—Regulations Relating to Labor","CHAPTER XL—PENSION BENEFIT GUARANTY CORPORATION","SUBCHAPTER E—PLAN TERMINATIONS","PART 4043—REPORTABLE EVENTS AND CERTAIN OTHER NOTIFICATION REQUIREMENTS","Subpart C—Advance Notice of Reportable Events"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-29.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:20Z","sha256":"1bf77c8c10b48b7cd9f571701ff6017a67499f4210af3af0ba204cd8742a5ed6","source_id":"us-cfr","stale":true,"prev":"us/29-cfr-4043.67","next":"us/29-cfr-4043.81"},"notice":"GroundRules: Original legal text. Not legal advice."}
