{"data":{"id":"us/29-cfr-776.30","jurisdiction":"us","citation":"29 CFR 776.30","heading":"Construction performed on temporarily idle facilities.","body":"The Act applies to work on a covered interstate instrumentality or production facility even though performed during periods of temporary non-use or idleness. 52 The courts have held the Act applicable to performance of construction work upon a covered facility even though the use of the facility was temporarily interrupted or discontinued. 53 It is equally clear that the repair or maintenance of a covered facility (including its machinery, tools, dies, and other equipment) though performed during the inactive or dead season, is subject to the Acts. 54","path":["Title 29—Labor","Subtitle B—Regulations Relating to Labor","CHAPTER V—WAGE AND HOUR DIVISION, DEPARTMENT OF LABOR","SUBCHAPTER B—STATEMENTS OF GENERAL POLICY OR INTERPRETATION NOT DIRECTLY RELATED TO REGULATIONS","PART 776—INTERPRETATIVE BULLETIN ON THE GENERAL COVERAGE OF THE WAGE AND HOURS PROVISIONS OF THE FAIR LABOR STANDARDS ACT OF 1938","Subpart B—Construction Industry"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-29.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:20Z","sha256":"60ec52ca7dc181ffeba1b0883e15d3fad1c90126113f908987fb6f68aa7b4828","source_id":"us-cfr","stale":true,"prev":"us/29-cfr-776.29","next":"us/29-cfr-778.0"},"notice":"GroundRules: Original legal text. Not legal advice."}
