{"data":{"id":"us/30-cfr-203.90","jurisdiction":"us","citation":"30 CFR 203.90","heading":"What is in a fabricator's confirmation report?","body":"This report shows you have committed in a timely way to the approved system for production. This report must include the following (or its equivalent for unconventionally acquired systems):\n(a) A copy of the contract(s) under which the fabrication yard is building the approved system for you;\n(b) A letter from the contractor building the system to the BSEE Regional Director for your region certifying when construction started on your system; and\n(c) Evidence of an appropriate down payment or equal action that you've started acquiring the approved system.","path":["Title 30—Mineral Resources","CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER A—MINERALS REVENUE MANAGEMENT","PART 203—RELIEF OR REDUCTION IN ROYALTY RATES","Subpart B—OCS Oil, Gas, and Sulfur General"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"d80628495e952e4e1ad6da0e69e215abc667f05de46b7a06415bc90936a9c08e","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-203.89","next":"us/30-cfr-203.91"},"notice":"GroundRules: Original legal text. Not legal advice."}
