{"data":{"id":"us/30-cfr-250.109","jurisdiction":"us","citation":"30 CFR 250.109","heading":"What documents must I prepare and maintain related to welding?","body":"(a) You must submit a Welding Plan to the District Manager before you begin drilling or production activities on a lease. You may not begin welding until the District Manager has approved your plan.\n(b) You must keep the following at the site where welding occurs:\n(1) A copy of the plan and its approval letter; and\n(2) Drawings showing the designated safe-welding areas.","path":["Title 30—Mineral Resources","CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF","Subpart A—General"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"e95d704cb0e7fe36c40d96c060506e48208d7b9a63365e68ceb663f671687713","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-250.108","next":"us/30-cfr-250.110"},"notice":"GroundRules: Original legal text. Not legal advice."}
