{"data":{"id":"us/30-cfr-250.132","jurisdiction":"us","citation":"30 CFR 250.132","heading":"What must I do when BSEE conducts an inspection?","body":"(a) When BSEE conducts an inspection, you must provide:\n(1) Access to all platforms, artificial islands, and other installations on your leases or associated with your lease, right-of-use and easement, or right-of-way; and\n(2) Helicopter landing sites and refueling facilities for any helicopters we use to regulate offshore operations.\n(b) You must make the following available for us to inspect:\n(1) The area covered under a lease, right-of-use and easement, right-of-way, or permit;\n(2) All improvements, structures, and fixtures on these areas; and\n(3) All records of design, construction, operation, maintenance, repairs, or investigations on or related to the area.","path":["Title 30—Mineral Resources","CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF","Subpart A—General"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"9c2400d3357ee3e994d33c1184a34f8cab5fb6c0df06f28a96b3ed55635b08ec","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-250.131","next":"us/30-cfr-250.133"},"notice":"GroundRules: Original legal text. Not legal advice."}
