{"data":{"id":"us/30-cfr-250.1750","jurisdiction":"us","citation":"30 CFR 250.1750","heading":"When may I decommission a pipeline in place?","body":"You may decommission a pipeline in place when the Regional Supervisor determines that the pipeline does not constitute a hazard (obstruction) to navigation and commercial fishing operations, unduly interfere with other uses of the OCS, or have adverse environmental effects.","path":["Title 30—Mineral Resources","CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF","Subpart Q—Decommissioning Activities"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"0f9526809d6db491823fc31d23559916b1b5a567d1b4d89990a3b857d3ab915a","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-250.1743","next":"us/30-cfr-250.1751"},"notice":"GroundRules: Original legal text. Not legal advice."}
