{"data":{"id":"us/30-cfr-250.195","jurisdiction":"us","citation":"30 CFR 250.195","heading":"What notification does BSEE require on the production status of wells?","body":"You must notify the appropriate BSEE District Manager when you successfully complete or recomplete a well for production. You must:\n(a) Notify the District Manager within 5 working days of placing the well in a production status. You must confirm oral notification by telefax or e-mail within those 5 working days.\n(b) Provide the following information in your notification:\n(1) Lessee or operator name;\n(2) Well number, lease number, and OCS area and block designations;\n(3) Date you placed the well on production (indicate whether or not this is first production on the lease);\n(4) Type of production; and\n(5) Measured depth of the production interval.","path":["Title 30—Mineral Resources","CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF","Subpart A—General"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"2b14e696f04e903ca099c327f64b22418f0ddc982617cbe13f60291800c88ce2","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-250.194","next":"us/30-cfr-250.196"},"notice":"GroundRules: Original legal text. Not legal advice."}
