{"data":{"id":"us/30-cfr-250.230","jurisdiction":"us","citation":"30 CFR 250.230","heading":"When are you required to submit an I3P Report?","body":"You must submit to BSEE any I3P reports required in § 250.232 for any equipment identified in your New or Unusual Technology Barrier Equipment Conceptual Plan and when required by the Regional Supervisor. BSEE will not approve your associated Conceptual Plan until BSEE reviews the required I3P Reports.","path":["Title 30—Mineral Resources","CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF","Subpart B—Plans and Information"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"c5b6239ab3a2a9a43330defc5307851d5b8e12cec5db289113a84ada1eb5368a","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-250.229","next":"us/30-cfr-250.231"},"notice":"GroundRules: Original legal text. Not legal advice."}
