{"data":{"id":"us/30-cfr-250.238","jurisdiction":"us","citation":"30 CFR 250.238","heading":"What well or completions information must my DWOP include?","body":"You must include the following information in your DWOP, as applicable, to be consistent with the activities to be addressed in the associated well permit(s):\n(a) A description and schematic of the typical wellbore, casing, and completion;\n(b) Information concerning the drilling and completion systems; and\n(c) Design and fabrication information for each wellbore riser system (e.g., drilling, completion, workover, intervention, injection, or production) deployed from a floating production facility or TLP.","path":["Title 30—Mineral Resources","CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF","Subpart B—Plans and Information"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"2d9c312fbdcc5f22732638b4be208a2733868b715c5b9f7069e088cdf101224a","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-250.237","next":"us/30-cfr-250.239"},"notice":"GroundRules: Original legal text. Not legal advice."}
