{"data":{"id":"us/30-cfr-250.239","jurisdiction":"us","citation":"30 CFR 250.239","heading":"What structural information must my DWOP include?","body":"You must include the following information in your DWOP, as applicable, to align with the activities to be addressed in the associated platform application, including any major modifications:\n(a) Structural design, fabrication, and installation information;\n(b) Design, fabrication, installation, and monitoring information on the tendon, or mooring systems, including the turret or buoy system, if applicable; and\n(c) Information on any active station keeping system(s) involving thrusters or other means of propulsion.","path":["Title 30—Mineral Resources","CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF","Subpart B—Plans and Information"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"8b15e761814190f316c2512ad3ea7b913a212eeca6830431c3517b87669995f9","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-250.238","next":"us/30-cfr-250.240"},"notice":"GroundRules: Original legal text. Not legal advice."}
