{"data":{"id":"us/30-cfr-250.246","jurisdiction":"us","citation":"30 CFR 250.246","heading":"When must I revise my DWOP?","body":"You must revise your approved DWOP to reflect any material change to the plan that does not involve a physical alteration of the equipment on the platform or the seabed.","path":["Title 30—Mineral Resources","CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF","Subpart B—Plans and Information"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"b490f8bec47343a3c0685fd2c9bf706e7df597c2d5a7d5822039441c5c73dd45","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-250.245","next":"us/30-cfr-250.247"},"notice":"GroundRules: Original legal text. Not legal advice."}
