{"data":{"id":"us/30-cfr-250.416","jurisdiction":"us","citation":"30 CFR 250.416","heading":"What must I include in the diverter description?","body":"You must include in the diverter description:\n(a) A description of the diverter system and its operating procedures;\n(b) A schematic drawing of the diverter system (plan and elevation views) that shows:\n(1) The size of the element installed in the diverter housing;\n(2) Spool outlet internal diameter(s);\n(3) Diverter-line lengths and diameters; burst strengths and radius of curvature at each turn; and\n(4) Valve type, size, working pressure rating, and location.","path":["Title 30—Mineral Resources","CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF","Subpart D—Oil and Gas Drilling Operations"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"57f4f363624241463356243dc645d3d4f91fe5ee0500300bbfcd2cc2f689ba96","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-250.415","next":"us/30-cfr-250.417"},"notice":"GroundRules: Original legal text. Not legal advice."}
