{"data":{"id":"us/30-cfr-250.460","jurisdiction":"us","citation":"30 CFR 250.460","heading":"What are the requirements for conducting a well test?","body":"(a) If you intend to conduct a well test, you must include your projected plans for the test with your APD (form BSEE-0123) or in an Application for Permit to Modify (APM) (form BSEE-0124). Your plans must include at least the following information:\n(1) Estimated flowing and shut-in tubing pressures;\n(2) Estimated flow rates and cumulative volumes;\n(3) Time duration of flow, buildup, and drawdown periods;\n(4) Description and rating of surface and subsurface test equipment;\n(5) Schematic drawing, showing the layout of test equipment;\n(6) Description of safety equipment, including gas detectors and fire-fighting equipment;\n(7) Proposed methods to handle or transport produced fluids; and\n(8) Description of the test procedures.\n(b) You must give the District Manager at least 24-hours notice before starting a well test.","path":["Title 30—Mineral Resources","CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF","Subpart D—Oil and Gas Drilling Operations"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"8a7c2f6d01c6e4de83b63834845e358e055be716216728f8b6ec03fb3750460d","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-250.459","next":"us/30-cfr-250.461"},"notice":"GroundRules: Original legal text. Not legal advice."}
