{"data":{"id":"us/30-cfr-250.501","jurisdiction":"us","citation":"30 CFR 250.501","heading":"Definition.","body":"When used in this subpart, the following term shall have the meaning given below:\nWell-completion operations means the work conducted to establish the production of a well after the production-casing string has been set, cemented, and pressure-tested.","path":["Title 30—Mineral Resources","CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF","Subpart E—Oil and Gas Well-Completion Operations"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"091ca35d6fdf9b66ede1511700814b330b36638bf6d9e8f39cd4d2e3ed8cdc2f","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-250.500","next":"us/30-cfr-250.502"},"notice":"GroundRules: Original legal text. Not legal advice."}
