{"data":{"id":"us/30-cfr-250.505","jurisdiction":"us","citation":"30 CFR 250.505","heading":"Subsea completions.","body":"No subsea well completion shall be commenced until the lessee obtains written approval from the District Manager in accordance with § 250.513 of this part. That approval shall be based upon a case-by-case determination that the proposed equipment and procedures will adequately control the well and permit safe production operations.","path":["Title 30—Mineral Resources","CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF","Subpart E—Oil and Gas Well-Completion Operations"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"680325f9da5eda86ee8dc21882f2d23d697a721cd600860c378e853b40b9a3aa","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-250.504","next":"us/30-cfr-250.506-250.508"},"notice":"GroundRules: Original legal text. Not legal advice."}