{"data":{"id":"us/30-cfr-250.609","jurisdiction":"us","citation":"30 CFR 250.609","heading":"Well-workover structures on fixed platforms.","body":"Derricks, masts, substructures, and related equipment shall be selected, designed, installed, used, and maintained so as to be adequate for the potential loads and conditions of loading that may be encountered during the operations proposed. Prior to moving a well-workover rig or well-servicing equipment onto a platform, the lessee shall determine the structural capability of the platform to safely support the equipment and proposed operations, taking into consideration the corrosion protection, age of the platform, and previous stresses to the platform.","path":["Title 30—Mineral Resources","CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF","Subpart F—Oil and Gas Well-Workover Operations"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"b8e864c029a3aafb3753f9c4b547314ded4e59c9dbf5d45694fecdb10d901e48","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-250.606-250.608","next":"us/30-cfr-250.610"},"notice":"GroundRules: Original legal text. Not legal advice."}
