{"data":{"id":"us/30-cfr-250.613","jurisdiction":"us","citation":"30 CFR 250.613","heading":"Approval and reporting for well-workover operations.","body":"(a) No well-workover operation except routine ones, as defined in § 250.601 of this part, shall begin until the lessee receives written approval from the District Manager. Approval for these operations must be requested on Form BSEE-0124, Application for Permit to Modify.\n(b) You must submit the following with Form BSEE-0124:\n(1) A brief description of the well-workover procedures to be followed, a statement of the expected surface pressure, and type and weight of workover fluids;\n(2) When changes in existing subsurface equipment are proposed, a schematic drawing of the well showing the zone proposed for workover and the workover equipment to be used;\n(3) All information required in § 250.731.\n(4) Where the well-workover is in a zone known to contain H2S or a zone where the presence of H2S is unknown, information pursuant to § 250.490 of this part; and\n(5) Payment of the service fee listed in § 250.125.\n(c) The following additional information shall be submitted with Form BSEE-0124 if completing to a new zone is proposed:\n(1) Reason for abandonment of present producing zone including supportive well test data, and\n(2) A statement of anticipated or known pressure data for the new zone.\n(d) Within 30 days after completing the well-workover operation, except routine operations, Form BSEE-0124, Application for Permit to Modify, shall be submitted to the District Manager, showing the work as performed. In the case of a well-workover operation resulting in the initial recompletion of a well into a new zone, a Form BSEE-0125, End of Operations Report, shall be submitted to the District Manager and shall include a new schematic of the tubing subsurface equipment if any subsurface equipment has been changed.","path":["Title 30—Mineral Resources","CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF","Subpart F—Oil and Gas Well-Workover Operations"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"ed803036096c045f6dbc1a720829da73a54c60c52eb1c86e1fbd15980bafcb23","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-250.612","next":"us/30-cfr-250.614"},"notice":"GroundRules: Original legal text. Not legal advice."}
