{"data":{"id":"us/30-cfr-250.812","jurisdiction":"us","citation":"30 CFR 250.812","heading":"Surface-controlled SSSVs—dry trees.","body":"You must equip all tubing installations open to a hydrocarbon-bearing zone that is capable of natural flow with a surface-controlled SSSV, except as specified in §§ 250.813, 250.815, and 250.816.\n(a) The surface controls must be located on the site or at a BSEE-approved remote location. You may request District Manager approval to situate the surface controls at a remote location.\n(b) You must equip dry tree wells not previously equipped with a surface-controlled SSSV, and dry tree wells in which a surface-controlled SSSV has been replaced with a subsurface-controlled SSSV, with a surface-controlled SSSV when the tubing is first removed and reinstalled.","path":["Title 30—Mineral Resources","CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF","Subpart H—Oil and Gas Production Safety Systems"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"7681d8c6dbb6b1580f16a5d2cb24d81a38013db1e987752005fa5387404aa154","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-250.811","next":"us/30-cfr-250.813"},"notice":"GroundRules: Original legal text. Not legal advice."}
