{"data":{"id":"us/30-cfr-250.864","jurisdiction":"us","citation":"30 CFR 250.864","heading":"Erosion.","body":"You must have a program of erosion control in effect for wells or fields that have a history of sand production. The erosion-control program may include sand probes, X-ray, ultrasonic, or other satisfactory monitoring methods. You must maintain records for each lease that indicate the wells that have erosion-control programs in effect. You must also maintain the results of the programs for at least 2 years and make them available to BSEE upon request.","path":["Title 30—Mineral Resources","CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 250—OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF","Subpart H—Oil and Gas Production Safety Systems"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"2cf830431360c1c8fb7a4df9259448eba970bf6a2ae37bd520b14d8d8e15a832","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-250.863","next":"us/30-cfr-250.865"},"notice":"GroundRules: Original legal text. Not legal advice."}
