{"data":{"id":"us/30-cfr-28.30","jurisdiction":"us","citation":"30 CFR 28.30","heading":"Quality control plans; filing requirements.","body":"As a part of each application for approval or modification of approval submitted pursuant to this part, each applicant shall file with MSHA a proposed quality control plan which shall be designed to assure the quality of short-circuit protection provided by the fuse for which approval is sought.","path":["Title 30—Mineral Resources","CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","SUBCHAPTER B—TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS","PART 28—FUSES FOR USE WITH DIRECT CURRENT IN PROVIDING SHORT-CIRCUIT PROTECTION FOR TRAILING CABLES IN COAL MINES","Subpart D—Quality Control"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"828d252b755215d439d62b1e27fc29770a3ac5cea154fdc55e002fcd4cdddfd4","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-28.25","next":"us/30-cfr-28.31"},"notice":"GroundRules: Original legal text. Not legal advice."}
