{"data":{"id":"us/30-cfr-285.631","jurisdiction":"us","citation":"30 CFR 285.631","heading":"When must I initiate activities under an approved COP?","body":"After your COP is approved, you must commence construction by the date given in the construction schedule required by 30 CFR 585.626(b)(21), and included as a part of your approved COP, unless BOEM approves a deviation from your schedule.","path":["Title 30—Mineral Resources","CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 285—RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF","Subpart F—Information Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"033f18b06e4140ed6cde73ab5b06a21c1a1d34adc4032273c9089cf6af74d2b7","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-285.616-285.630","next":"us/30-cfr-285.632"},"notice":"GroundRules: Original legal text. Not legal advice."}
