{"data":{"id":"us/30-cfr-285.632","jurisdiction":"us","citation":"30 CFR 285.632","heading":"What documents must I submit before I may construct and install facilities under my approved COP?","body":"(a) You must submit to BSEE the documents listed in the following table:\nDocument: Requirements are found in:\n(1) Facility Design Report § 285.701\n(2) Fabrication and Installation Report § 285.702\n(b) You must submit your safety management system, as required by § 285.810.\n(c) These activities must fall within the scope of your approved COP. If they do not fall within the scope of your approved COP, you will be required to submit a revision to your COP, under 30 CFR 585.634, for BOEM approval before commencing the activity.","path":["Title 30—Mineral Resources","CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 285—RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF","Subpart F—Information Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"c38c5f8eb71964881c12a73b8374451183d747ebd599620dab78420cefa6117e","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-285.631","next":"us/30-cfr-285.633"},"notice":"GroundRules: Original legal text. Not legal advice."}
