{"data":{"id":"us/30-cfr-285.651","jurisdiction":"us","citation":"30 CFR 285.651","heading":"When may I construct complex or significant OCS facilities on my limited lease or any facilities on my project easement proposed under my GAP?","body":"If you are applying for a project easement, or installing a facility or a combination of facilities on your limited lease deemed by BOEM to be complex or significant, as provided in 30 CFR 585.648(a)(1), you also must comply with the requirements of subpart G of this part and submit your safety management system description required by § 285.810 before construction may begin.","path":["Title 30—Mineral Resources","CHAPTER II—BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 285—RENEWABLE ENERGY AND ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF","Subpart F—Information Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"fb449973b7ec48092ca4b9ba2fe4801ac4137158b7a4e7dbf6b5ea97d970d5d3","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-285.650","next":"us/30-cfr-285.652"},"notice":"GroundRules: Original legal text. Not legal advice."}
