{"data":{"id":"us/30-cfr-550.1155","jurisdiction":"us","citation":"30 CFR 550.1155","heading":"What information must I submit for sensitive reservoirs?","body":"You must submit to the Regional Supervisor an original and two copies of Form BOEM-0127; one of the copies must be a public information copy in accordance with §§ 550.186 and 550.197, and marked “Public Information.” You must also submit two copies of the supporting information, as listed in the table in § 550.1167. You must submit this information:\n(a) Within 45 days after beginning production from the reservoir or discovering that it is sensitive;\n(b) At least once during the calendar year, but you do not need to resubmit unrevised structure maps (§ 550.1167(a)(2)) or previously submitted well logs (§ 550.1167(c)(1));\n(c) Within 45 days after you revise reservoir parameters; and\n(d) Within 45 days after the Regional Supervisor classifies the reservoir as sensitive under § 550.1154(c).","path":["Title 30—Mineral Resources","CHAPTER V—BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 550—OIL AND GAS AND SULFUR OPERATIONS IN THE OUTER CONTINENTAL SHELF","Subpart K—Oil and Gas Production Requirements."],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"6cf6b78762bcaf94776de3f0657158e5ac40e81856db2f5bf9e81fb1267afa46","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-550.1154","next":"us/30-cfr-550.1165"},"notice":"GroundRules: Original legal text. Not legal advice."}
