{"data":{"id":"us/30-cfr-550.1167","jurisdiction":"us","citation":"30 CFR 550.1167","heading":"What information must I submit with forms and for approvals?","body":"You must submit the supporting information listed in the following table with the form identified in column 1 and for the approval required under this subpart identified in column 2:\nSRI BOEM-0127 (2 copies) Reservoir reclassification\n(a) Maps:\n(1) Base map with surface, bottomhole, and completion locations with respect to the unit or lease line and the orientation of representative seismic lines or cross-sections\n(2) Structure maps with penetration point and subsea depth for each well penetrating the reservoirs, highlighting subject wells; reservoir boundaries; and original and current fluid levels √ √\n(3) Net sand isopach with total net sand penetrated for each well, identified at the penetration point *\n(4) Net hydrocarbon isopach with net feet of pay for each well, identified at the penetration point *\n(b) Seismic data:\n(1) Representative seismic lines, including strike and dip lines that confirm the structure; indicate polarity\n(2) Amplitude extraction of seismic horizon, if applicable √\n(c) Logs:\n(1) Well log sections with tops and bottoms of the reservoir(s) and proposed or existing perforations √ √\n(2) Structural cross-sections showing the subject well and nearby wells √\n(d) Engineering data:\n(1) Estimated recoverable reserves for each well completion in the reservoir; total recoverable reserves for each reservoir; method of calculation; reservoir parameters used in volumetric and decline curve analysis √\n(2) Well schematics showing current and proposed conditions\n(3) The drive mechanism of each reservoir √ √\n(4) Pressure data, by date, and whether they are estimated or measured √\n(5) Production data and decline curve analysis indicative of the reservoir performance √\n(6) Reservoir simulation with the reservoir parameters used, history matches, and prediction runs (include proposed development scenario) *\n(e) General information:\n(1) Detailed economic analysis\n(2) Reservoir name and whether or not it is competitive as defined under § 250.105 √ √\n(3) Operator name, lessee name(s), block, lease number, royalty rate, and unit number (if applicable) of all relevant leases\n(4) Geologic overview of project √\n(5) Explanation of why the proposed completion scenario will maximize ultimate recovery\n(6) List of all wells in subject reservoirs that have ever produced or been used for injection √\n√ Required.\n* Additional items the Regional Supervisor may request.\nNote: All maps must be at a standard scale and show lease and unit lines. The Regional Supervisor may waive submittal of some of the required data on a case-by-case basis.\n(f) Depending on the type of approval requested, you must submit the appropriate payment of the service fee(s) listed in § 550.125, according to the instructions in § 550.126.","path":["Title 30—Mineral Resources","CHAPTER V—BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 550—OIL AND GAS AND SULFUR OPERATIONS IN THE OUTER CONTINENTAL SHELF","Subpart K—Oil and Gas Production Requirements."],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"27ba5c5f0d4325090b908697a884b9e5d11a404fac2d5094fc5d711eeb30f070","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-550.1166","next":"us/30-cfr-550.1400"},"notice":"GroundRules: Original legal text. Not legal advice."}
