{"data":{"id":"us/30-cfr-585.614","jurisdiction":"us","citation":"30 CFR 585.614","heading":"When may I begin conducting activities under my approved SAP?","body":"(a) You may begin conducting the activities approved in your SAP following BOEM approval of your SAP.\n(b) If you are installing a facility or a combination of facilities deemed by BOEM to be complex or significant, as provided in § 585.613(a)(1), you must comply with the requirements of 30 CFR part 285, subpart G, and also submit your Safety Management System description required by 30 CFR 285.810 before construction may begin.","path":["Title 30—Mineral Resources","CHAPTER V—BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 585—RENEWABLE ENERGY ON THE OUTER CONTINENTAL SHELF","Subpart G—Plans and Information Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"c3c4317b28a99f4781e4afe09f30892247c600ac2c8c5976c0824ab62bb15434","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-585.613","next":"us/30-cfr-585.615"},"notice":"GroundRules: Original legal text. Not legal advice."}
