{"data":{"id":"us/30-cfr-585.651","jurisdiction":"us","citation":"30 CFR 585.651","heading":"When may I construct complex or significant OCS facilities on my limited lease or any facilities on my project easement proposed under my GAP?","body":"If you are applying for a project easement or installing a facility or a combination of facilities on your limited lease deemed by BOEM to be complex or significant, as provided in § 585.648(a)(1), you also must comply with the requirements of 30 CFR part 285, subpart G, and submit your safety management system description required by 30 CFR 285.810 before construction may begin.","path":["Title 30—Mineral Resources","CHAPTER V—BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 585—RENEWABLE ENERGY ON THE OUTER CONTINENTAL SHELF","Subpart G—Plans and Information Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"099ac0794af8b16b42fb184f1609c887aff36487814b57887c44a3a2084a5e91","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-585.650","next":"us/30-cfr-585.652"},"notice":"GroundRules: Original legal text. Not legal advice."}