{"data":{"id":"us/30-cfr-585.652","jurisdiction":"us","citation":"30 CFR 585.652","heading":"How long do I have to conduct activities under an approved GAP?","body":"After BOEM approves your GAP, you have:\n(a) For a limited lease, the time period established under § 585.236(a)(2), unless we renew the operations period under §§ 585.425 through 585.429.\n(b) For a ROW grant or RUE grant, the time provided in the terms of the grant.","path":["Title 30—Mineral Resources","CHAPTER V—BUREAU OF OCEAN ENERGY MANAGEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER B—OFFSHORE","PART 585—RENEWABLE ENERGY ON THE OUTER CONTINENTAL SHELF","Subpart G—Plans and Information Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"0cfd57246d7680fcca46a030e3ed0434faa1a74ab2938e4a3943fb776f8edcef","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-585.651","next":"us/30-cfr-585.653"},"notice":"GroundRules: Original legal text. Not legal advice."}
