{"data":{"id":"us/30-cfr-7.95","jurisdiction":"us","citation":"30 CFR 7.95","heading":"Purpose and effective date.","body":"Part 7, subpart A general provisions apply to subpart F. Subpart F establishes the specific requirements for MSHA approval of diesel power packages intended for use in approved equipment in areas of underground coal mines where electric equipment is required to be permissible. It is effective November 25, 1996.","path":["Title 30—Mineral Resources","CHAPTER I—MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR","SUBCHAPTER B—TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS","PART 7—TESTING BY APPLICANT OR THIRD PARTY","Subpart F—Diesel Power Packages Intended for Use in Areas of Underground Coal Mines Where Permissible Electric Equipment is Required"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"32c94ae3b343c2880801c5358a7aed47b6668b75b8c8c1e99b31d684ed541db2","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-7.92","next":"us/30-cfr-7.96"},"notice":"GroundRules: Original legal text. Not legal advice."}
