{"data":{"id":"us/30-cfr-784.19","jurisdiction":"us","citation":"30 CFR 784.19","heading":"Underground development waste.","body":"Each plan shall contain descriptions, including appropriate maps and cross section drawings of the proposed disposal methods and sites for placing underground development waste and excess spoil generated at surface areas affected by surface operations and facilities, according to 30 CFR 817.71 through 817.74. Each plan shall describe the geotechnical investigation, design, construction, operation, maintenance and removal, if appropriate, of the structures and be prepared according to 30 CFR 780.35.","path":["Title 30—Mineral Resources","CHAPTER VII—OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER G—SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS","PART 784—UNDERGROUND MINING PERMIT APPLICATIONS—MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"125d3816eeaf61ea81994c6c5e447077199207b0547e6630be352fe2dfd43312","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-784.18","next":"us/30-cfr-784.20"},"notice":"GroundRules: Original legal text. Not legal advice."}
