{"data":{"id":"us/30-cfr-784.30","jurisdiction":"us","citation":"30 CFR 784.30","heading":"Support facilities.","body":"Each applicant for an underground coal mining and reclamation permit shall submit a description, plans, and drawings for each support facility to be constructed, used, or maintained within the proposed permit area. The plans and drawings shall include a map, appropriate cross sections, design drawings, and specifications sufficient to demonstrate compliance with § 817.181 of this chapter for each facility.","path":["Title 30—Mineral Resources","CHAPTER VII—OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER G—SURFACE COAL MINING AND RECLAMATION OPERATIONS PERMITS AND COAL EXPLORATION SYSTEMS UNDER REGULATORY PROGRAMS","PART 784—UNDERGROUND MINING PERMIT APPLICATIONS—MINIMUM REQUIREMENTS FOR RECLAMATION AND OPERATION PLAN"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"cf963b1fb120bb7199cfcb4e2b53d6ba31b75fc85c474f0d133d1d22f35335f8","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-784.29","next":"us/30-cfr-784.200"},"notice":"GroundRules: Original legal text. Not legal advice."}
