{"data":{"id":"us/30-cfr-816.113","jurisdiction":"us","citation":"30 CFR 816.113","heading":"Revegetation: Timing.","body":"Disturbed areas shall be planted during the first normal period for favorable planting conditions after replacement of the plant-growth medium. The normal period for favorable planting is that planting time generally accepted locally for the type of plant materials selected.","path":["Title 30—Mineral Resources","CHAPTER VII—OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR","SUBCHAPTER K—PERMANENT PROGRAM PERFORMANCE STANDARDS","PART 816—PERMANENT PROGRAM PERFORMANCE STANDARDS—SURFACE MINING ACTIVITIES"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-30.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:24Z","sha256":"50a7df38fd91537b0bc7866d7f2ae769219f4dba2eafe5db1c1c7656e5710d46","source_id":"us-cfr","stale":true,"prev":"us/30-cfr-816.111","next":"us/30-cfr-816.114"},"notice":"GroundRules: Original legal text. Not legal advice."}
