{"data":{"id":"us/33-cfr-117.1055","jurisdiction":"us","citation":"33 CFR 117.1055","heading":"Skagit River.","body":"The draws of all bridges across the Skagit river need not be opened for the passage of vessels. However, the draws shall be returned to operable condition within one year after notification by the District Commander to do so.","path":["Title 33—Navigation and Navigable Waters","CHAPTER I—COAST GUARD, DEPARTMENT OF HOMELAND SECURITY","SUBCHAPTER J—BRIDGES","PART 117—DRAWBRIDGE OPERATION REGULATIONS","Subpart B—Specific Requirements"],"source_url":"https://www.ecfr.gov/api/versioner/v1/full/2026-08-25/title-33.xml","current_through":"2026-08-25","vintage":"","retrieved_at":"2026-08-27T02:25:35Z","sha256":"f54e3f73147bb7b0b254f95dc415e171480987e105c6e7ac53b530aa99d392b0","source_id":"us-cfr","stale":true,"prev":"us/33-cfr-117.1053","next":"us/33-cfr-117.1058"},"notice":"GroundRules: Original legal text. Not legal advice."}
